Siretsko-Pecherskaya Line   

Microprocessor centralization of points and signals at Syrets station. The total number of switches is 2, the length of the section is 1.55 km. Constant use.

Microprocessor centralization of switches and signals at Borispolskaya station. The total number of switches is 6, the length of the section is 2.36 km. Constant use.

Microprocessor centralization of switches and signals of the technical station of the Kharkov electric depot. The total number of hands is 38. Constant operation.

Microprocessor centralization of switches and signals at Chervony Khutor station. The total number of switches is 2, the length of the section is 1.85 km. Constant use.